Your plan should be a "Standard Operating Procedure (SOP) Manual" tailored to your specific radiation sources and activities. Summary of Ionising Radiation Regulations 2023 (New) - NEA
This is where engineering meets bureaucracy. radiation protection plan template singapore
| Zone | Definition | Access | Signage | |------|------------|--------|---------| | | Dose rate > 1.0 mSv/week | Authorised personnel only, with dosimeter | Standard trefoil + "CAUTION – RADIATION" | | Supervised Area | Dose rate 0.1–1.0 mSv/week | Limited access, training required | Trefoil + "RADIATION AREA" | Your plan should be a "Standard Operating Procedure
This plan applies to: