Virar-alibaug Multimodal Corridor Route Map -
: 14 lanes in total, including space for a Metro line , dedicated bus lanes, and separate lanes for motorized and non-motorized traffic.
Just like the Mumbai Trans Harbour Link (MTHL) connected South Mumbai to Navi Mumbai, the VAMC will connect the Northern and Southern rims of the MMR. It is the backbone of "New Mumbai." virar-alibaug multimodal corridor route map
| Symbol / Color | Meaning | |----------------------|---------------------------------------| | | VAMC main alignment (6/8 lane) | | Blue dashed line | Proposed rail/metro along the median | | Black dots | Toll plazas (5–6 planned) | | Green patches | Eco-sensitive zones (tunnel/viaduct) | | Yellow stars | Major interchanges | | Orange circles | Truck stops / logistics parks | : 14 lanes in total, including space for
The project is being executed by the Maharashtra State Road Development Corporation (MSRDC) in two distinct phases. Status (As of April 2026) Navghar to Balavali Status (As of April 2026) Navghar to Balavali
The total estimated project cost is approximately ₹55,000 to ₹64,000 crore .