首页  编辑  

Z Os Adcd 113 13 Work ⚡

When ADC 113 13 work is enabled, the z/OS operating system uses a combination of algorithms and techniques to compress data in real-time. The process works as follows:

| Risk | Probability | Severity | Mitigation | |------|-------------|----------|-------------| | Incorrect interpretation of “113” as RSU leads to wrong PTF bundle | Medium | High | Verify with LIST HOLDDATA and IBM Shopz | | WORK dataset failures during APPLY (code 13) | High | Medium | Allocate SMPWORK with 113 tracks minimum | | Co-requisite missing for level “13” components | Low | High | Use REPORT MISSING before APPLY | z os adcd 113 13 work

The job completed. Return code 000.

STEP13 – EXEC PGM=COBOL13,PARM=’FINISH WORK’ When ADC 113 13 work is enabled, the